CLIENT | HILLINGDON PENTECOSTAL CHURCH

CONTRACT | UCT MINOR WORKS/ EXTENSION

SECTOR | Commercial

TIMESCALE | 21 weeks

VALUE | £ 800,000

Hillingdon_LR_009.jpg

A spacious new extension for the church that is bathed in natural light.

Hillingdon_LR_004.jpg
Hillingdon_LR_002.jpg
 
Hillingdon_LR_005.jpg

Hillingdon Pentecostal Church instructed Wren to build a new extension for their growing congregation and a room that could be used for a variety of activities by the local community.  The works involved the demolition of the rear building (incl asbestos removal) and the underpinning of the existing building.  The extension was constructed with block and beam flooring, block walls and external timber cladding. 

Hillingdon_LR_008.jpg
531_250SouthOakWay_010_LR.jpg

The room is flooded with natural light from all aspects with full height glazing and sky lights.    Wren carried out all the M&E works including lighting design, CCTV, Fire Alarm upgrade and data installation.

 
531_250SouthOakWay_012_LR.jpg
Hillingdon_LR_006.jpg